Our contracted endeavour centred on the pivotal remediation of deteriorating pavement in Blackbutt, NSW, acting on behalf of Urban Growth. Initially envisioned as a complex 5-stage initiative, we harnessed our seasoned expertise to engineer a more streamlined staging plan, ultimately condensing the project into a remarkably efficient 2 stages of civil Works. This inventive approach not only optimised the overall process but also astoundingly compressed the anticipated timeline from a projected 13 weeks to a commendable 9 weeks. Concurrently, our comprehensive approach encompassed vital components beyond mere pavement renewal. Lime stabilisation was meticulously executed for the existing subgrade and backfill, infusing durability and strength. We also undertook the meticulous adjustment of the existing storm water system, ensuring efficient drainage management. Additionally, our commitment extended to installing thoughtfully designed street landscaping, and line marking, which not only contributed to the aesthetic enhancement of the area but also exemplified our holistic project approach. By embarking on this innovative journey, we epitomised our proficiency in agile project management and strategic adaptability. This achievement stands as a testament to our unwavering dedication to delivering impactful, time-efficient solutions that elevate safety, functionality, and community well-being in the Blackbutt area.

Scope

  • Project assessment and planning
  • Surface preparation
  • Excavation of existing pavement to 1.5m below subbase level
  • Lime stabilisation of existing subgrade and backfill material
  • Adjustment to existing storm water system
  • Reconstruction of kerb
  • Preparation of subbase course
  • Gradation of sub base
  • Preparation of base course
  • Installation of flexible pavement
  • Installation of street landscaping and line marking
  • Line marking
  • Quality assurance

Challenges

During the project’s execution, several intricate challenges arose, showcasing our team’s adaptability and expertise. Condensing the original 5-stage plan into 2 stages civil works required meticulous logistical planning and coordination to ensure a smooth transition. Overcoming this adjustment while maintaining project integrity was a balancing act that demanded precision. Additionally, the lime stabilisation process for the existing subgrade and backfill presented technical complexities of civil works, requiring precise execution to achieve the desired durability. Integrating street landscaping and line marking while adhering to the accelerated timeline posed further challenges, necessitating seamless coordination among multiple aspects of the project. Furthermore, the adjustment of the existing storm water system demanded careful consideration of drainage patterns and existing infrastructure, to ensure an effective system aligned with the revitalised pavement and proper line marking for the traffic to flow nicely. Overall, our team’s ability to navigate these multifaceted challenges attests to our project management skills and adaptability in delivering a successful outcome for the Blackbutt community.

Outcomes

Safety and Environment

The project’s outcomes underscore our unwavering commitment to safety and environmental stewardship. Despite the condensed timeline, rigorous safety protocols were adhered to at every stage of civil works, ensuring the well-being of both workers and the community. The implementation of lime stabilisation for the subgrade and backfill not only enhanced structural integrity but also aligned with sustainable practices, minimising environmental impact.

Quality Line Marking

The strategic adjustment of staging did not compromise the quality of workmanship. The meticulous execution of lime stabilisation added durability and longevity to the pavement. Furthermore, the integration of street landscaping and line marking demonstrated a focus on aesthetic refinement without compromising functionality.

Community

The project’s impact reverberated positively throughout the Blackbutt community. The streamlined execution minimised disruptions, leading to an improved pavement faster than initially projected. The revitalised streetscape, including meticulously installed street landscaping, contributed to a visually appealing environment that fosters community pride and engagement.

Timeframe

The project was not only executed within the condensed timeframe but also exceeded expectations. The innovative staging adjustment significantly reduced the overall project duration, demonstrating our team’s efficiency and adaptability. The civil works project’s timely completion with minimally disrupted the community while showcasing our dedication to adhering to commitments.