Damage and removal sequence
Affected areas were inspected and the removal works sequenced around the condition of the existing building and retained elements.
SCE project | LAHC property fire restoration
SCE Corp completed coordinated fire-damage rebuilding and residential reinstatement works at an LAHC property in Hamilton South, Newcastle, including damaged roof removal, structural rebuilding, roof replacement and internal reinstatement.
Project overview
This LAHC property fire restoration and residential reinstatement project required the removal of damaged roof and building elements, followed by staged reconstruction. SCE coordinated the construction works through the affected areas, from the exposed fire-damaged structure to new timber framing, roof installation and reinstatement.
The work sequence was planned around site safety, access, protection of retained areas and coordination with the relevant project stakeholders. Specialist design, inspection and certification responsibilities remained with the relevant appointed practitioners.
Delivery controls
Affected areas were inspected and the removal works sequenced around the condition of the existing building and retained elements.
Wall framing, roof framing, roof covering and associated reinstatement were coordinated in logical stages with relevant project stakeholders.
Completed work was checked progressively, with construction records and required practitioner inputs managed through the project close-out process.
Genuine SCE project evidence
The photographs below show the progression from fire damage and stripped building elements through framing reconstruction and roof completion.
Project video
The video summarises the progression from fire-damaged building elements through structural reconstruction, roof reinstatement and completion.
Project outcome
The fire-damaged roof and affected building elements at the LAHC property were removed and rebuilt. The project record shows the progression through new wall and roof framing to the completed tiled roof and guttering, with internal reinstatement coordinated as part of the broader project scope.
Project questions
At the LAHC property, SCE completed coordinated construction works including removal of damaged roof and building elements, reconstruction of timber wall and roof framing, roof tile and gutter reinstatement, and coordination of internal building reinstatement.
The affected areas were inspected and the work was sequenced from controlled removal through framing reconstruction, roof installation and reinstatement. SCE coordinated the construction works with relevant project stakeholders and worked to the applicable project documents and required inspections.
The work was planned around the damaged structure, controlled removal, site access and protection of retained areas. Specialist design, inspection and certification responsibilities remained with the relevant appointed practitioners.
The fire-damaged roof and affected building elements were removed and rebuilt. New wall and roof framing, tiled roofing and guttering were installed, with internal reinstatement coordinated as part of the project scope.
Insurers, loss assessors, community housing providers, government asset managers, strata and property managers, owners corporations and property owners can contact SCE. Providing the site location, available reports and photographs, access constraints and required response timeframe will help SCE review the scope.