Project outcome and scope limits
State what is being built, repaired or changed, which areas are included, what must remain, and the intended condition at handover. Distinguish permanent works, temporary works and construction support.
NSW construction coordination guide
A practical briefing guide for owners, developers and delivery teams preparing site information, design responsibilities, interfaces and construction constraints before engineering work is commissioned or coordinated.
A civil or structural design request is stronger when it explains the project outcome, known site conditions, approval pathway, interfaces, construction sequence and the decisions the design must support. A short request such as “provide engineering” leaves responsibility, exclusions and issue status open to interpretation.
This article supports the preparation and coordination stage. SCE’s engineering design coordination service owns the broader service journey. Project-specific calculations, regulated designs, declarations and certification must remain with the appropriately qualified or registered practitioners for the actual work.
State what is being built, repaired or changed, which areas are included, what must remain, and the intended condition at handover. Distinguish permanent works, temporary works and construction support.
Record the consent or approval pathway, relevant conditions, nominated certifier and known building classification. Identify whether any regulated design or practitioner obligations may apply.
Provide current survey, title and easement information, service records, available geotechnical material, existing drawings, photographs and any verified investigation or condition information.
Define known design actions, finished levels, drainage outcomes, asset life or durability expectations, maintenance needs and any project-specific operational requirements without inventing missing values.
List each discipline, deliverable, author, reviewer, declarant where applicable, approver and information dependency. Make gaps visible before programme dates are committed.
Identify where structure, civil works, stormwater, architecture, services, access, landscaping, existing assets or neighbouring property affect one another and who closes each interface.
Describe plant and delivery access, working space, staging, occupied areas, temporary support, inspection access and hold points that could change the practical design solution.
Agree naming, revision status, design review, approved-for-construction release, variation control, inspection records and the final documents required for certification, handover or asset records.
A feasibility sketch, an approval package and a construction-issued design serve different decisions. The brief should name the required issue status and prevent preliminary material from being mistaken for construction information.
| Stage | Decision to support | Typical briefing evidence |
|---|---|---|
| Feasibility | Is the concept plausible and what information is still missing? | Site constraints, concept scope, survey status, known services, preliminary loads and an assumptions register. |
| Approval | What documentation is required for the consent, certificate or authority process? | Approval conditions, coordinated plans, discipline inputs, certifier requirements and responsibility allocation. |
| Construction issue | Is there sufficient coordinated detail to build the defined work? | Issued drawings and specifications, design status, calculations where required, interfaces, hold points and approved changes. |
| Handover | What records prove the installed outcome and close outstanding obligations? | Final revisions, inspection and test records, declarations or certificates where applicable, variations and asset information. |
Confirm which survey and geotechnical information is current, who sets finished levels and how stormwater, excavation, retaining elements and existing services are coordinated.
Record grids, openings, set-downs, façade and waterproofing interfaces, movement requirements and the party responsible for resolving dimensional conflicts.
Identify required service routes, pits, sleeves, penetrations, clearances and equipment zones before structural or civil details are finalised.
Separate permanent design from temporary works, lifting, propping, excavation support, sequencing and access obligations, then allocate each design and review responsibility.
Current NSW Government guidance says regulated designs and design compliance declarations apply to specified work on regulated building classes, currently class 2, 3 and 9c buildings, with timing and scope depending on the building and work. Relevant designs must be prepared, declared and lodged by the responsible registered practitioners before the associated work starts where the scheme applies.
Do not infer the pathway from the project name alone. Confirm the building class, type of work, exclusions, practitioner registration class, design category, certifier requirements and current legislation for the exact project. A contractor’s DBP registration does not transfer the design practitioner’s declaration responsibility.
Buildability comments should be returned to the responsible designer for assessment and incorporated through controlled revisions. Site teams must not resolve design uncertainty by making undocumented changes.
Record the reason for every proposed change, affected drawings and specifications, design disciplines, approval implications, cost and programme effect. The responsible designer should assess the technical change and issue the required revised information before the affected work proceeds.
For regulated building work, current NSW guidance requires new or updated regulated designs and declarations before varied work involving a building element or performance solution continues. The project brief should nominate the person responsible for design change requests, practitioner review, lodgement and release to site.
Which drawings, calculations, reports, schedules, specifications, declarations, inspections and final records are included—and at what issue status?
Which surveys, investigations, loads, levels, service data and third-party information are supplied by the client, and what happens if they change?
Who prepares, coordinates, reviews, declares, lodges, certifies and approves each component? Which items are expressly excluded?
How many review cycles are included, how are comments closed, and how will variations, site queries and revised construction issues be controlled?
This checklist owns the informational preparation task. For the broader service scope, review engineering design coordination. For construction packages involving drainage, earthworks, concrete, services or other civil interfaces, visit SCE Civil Services. Relevant delivery proof is organised in the civil infrastructure projects collection.
When the project information is incomplete, send the site address, current drawings, approval material, known constraints and required decision through the SCE enquiry page. SCE can review construction and coordination fit without assuming consultant, certifier or registered-practitioner responsibilities.
Include the project outcome, scope limits, approval context, current site information, performance criteria, discipline responsibilities, interfaces, construction constraints, required issue status and change-control process. Identify missing information instead of replacing it with assumptions.
No. A contractor can contribute construction planning, coordination and buildability information, but project-specific design, declarations and certification remain with the appropriately qualified or registered practitioners and certifier for the actual work.
Start during scope and concept development, then repeat before construction information is issued and whenever a material design or staging change is proposed. Early review is most useful when designers can assess the feedback through controlled revisions.
It is a register that assigns each design input and deliverable to an author, coordinator, reviewer, declarant or approver as applicable. It also records dependencies, due dates, exclusions and evidence needed to close each interface.
No. Application depends on the building class, work and current legislation. NSW guidance currently identifies specified work on class 2, 3 and 9c buildings as regulated. Confirm the actual project pathway and practitioner obligations before work starts.
Raise a documented change request that identifies the reason, affected information, technical interfaces, approval impact, cost and programme effect. The responsible practitioner should assess and issue the required revision before the affected work proceeds.
Send the site address, scope, current drawings, survey and approval material, available investigations, known services and constraints, required programme and the specific decision or construction package to be reviewed. Note which information is preliminary or missing.
Share the current drawings, approval material, verified site information, known interfaces and the construction decision you need to make. SCE can review the construction and coordination inputs and identify the next evidence required.
Discuss the project brief with SCE