SCE project · Normanhurst NSW

Normanhurst Garage Alteration

SCE Corp upgraded an existing Normanhurst garage, repairing roof trusses and renewing the ceiling, floor tiles, painted finishes and electrical fixtures.

Before-and-after views of the Normanhurst garage alteration
Before-and-after comparison of ceiling and floor finishes before and after the Normanhurst garage alteration.
Project overview

Ceiling, Floor and Fixture Alteration

SCE assessed the property, procured materials, removed the existing ceiling, inspected and repaired the roof trusses, installed and painted the new ceiling, replaced the floor tiles and installed electrical fixtures.

Initial condition

The before photographs show the original ceiling condition and garage floor.

Garage alteration works

SCE completed ceiling removal, structural inspection and repair, new ceiling finishes, floor replacement and electrical-fixture work.

Visual outcome

The after views show a continuous painted ceiling and a consistent completed floor finish within the garage.

Inspection after ceiling removal informed the repair and reinstatement sequence, allowing the roof structure, ceiling finish, flooring and fixtures to be addressed together.

Work sequence

Four Coordinated Stages

Assess

SCE assessed the garage, defined the scope and planned materials for the work.

Remove

The listed works include demolition of the existing ceiling and removal of the former floor finish.

Inspect and repair

The underlying structure was exposed for inspection, with roof-truss repair included in the scope.

Reinstate

SCE installed and painted the ceiling, laid replacement floor tiles, installed electrical fixtures and completed the final checks.

Project photographs

Completed Garage Upgrade

Building work

The garage upgrade combined roof-structure repair with ceiling, flooring and fixture renewal.

The work connected structural inspection and roof-truss repair with new ceiling finishes, floor tiles and electrical fixtures.

Before and after

The retained page-specific image shows the former and completed ceiling and floor finishes.

The before-and-after comparison shows the renewed ceiling and consistent floor finish following the alteration works.

Continue your journey

Related SCE Information

Frequently asked questions

Normanhurst Garage Alteration

What work did SCE complete for the Normanhurst garage alteration?

SCE completed assessment, ceiling demolition, structural inspection, roof-truss repair, new ceiling and paint finishes, floor-tile replacement and electrical fixtures.

What does the before-and-after image show?

It shows the former and completed garage ceiling and floor finishes in the Normanhurst project.

What ceiling work was completed?

SCE removed the existing ceiling, inspected and repaired the roof trusses, then installed and painted the new ceiling.

What flooring work was completed?

SCE removed the existing floor finish and installed replacement floor tiles.

What structural repairs were included?

The structural work included inspection of the exposed roof structure and repairs to the roof trusses.

What electrical work was included?

Electrical fixtures and appliances were installed as part of the garage upgrade.

How can I discuss a garage alteration with SCE?

Use the Contact SCE page to provide the property location, existing garage condition, intended use, known structural or service issues, access constraints and available drawings or approval information.

Discuss Your Garage Alteration

Share the location, existing garage condition, intended use, known structural or service issues, access constraints and available project documents so SCE can assess the work and discuss the next steps.