Renovation and extension budget planner NSW

Put construction, consultants, approvals, temporary accommodation and contingency into the same renovation budget. Enter your own allowances, mark what is still provisional and use the gaps to decide which site checks or quotations you need before committing to a design.

This planner totals your inputs. It does not predict construction prices, property value, tax savings or approval eligibility. Avoid double-counting items already covered in your construction allowance.

No login or email required. The tool keeps your answers in this tab. Choose the optional review link to carry the summary to Contact SCE; nothing is submitted automatically.

Enter your own allowances

All values are Australian dollars. Leave unknown costs blank. Enter 0 only when the heading is confirmed as not applicable or already included elsewhere.

Choose your own project allowance, from 0 to 100%. No contingency rate is prescribed by this tool.

This planner needs JavaScript to build your budget. You can also contact SCE to discuss your project.

Plan the next step with SCE

The guide to renovation costs beyond the builder quote explains wider allowances to consider when preparing the inputs; it does not prescribe project prices.

SCE Corp brings engineering assessment, design coordination, approvals, procurement and construction into renovation planning. We review how the work can be built and where investigations or design decisions can improve the scope. Share your location, drawings, inspection reports and priorities so we can help develop a practical project budget.

Completed rear elevation after the Toronto major renovation
Completed rear elevation after SCE’s Toronto major renovation.

Renovation and extension budget planning FAQs

Our construction budget and quotation questions explain how to compare scope, allowances and exclusions alongside your planning figures.

How should I budget for hidden structural defects?

Separate confirmed work from unresolved conditions, and ask what investigations can reduce uncertainty before construction. Allow for the engineer’s assessment, any required support, the repair scope and its effect on the work sequence. At SCE’s Toronto renovation, an inadequately supported slab area needed attention before the concrete repairs could proceed. The support and repair works were engineered, inspected and signed off. Use the findings and written scope to review your allowance with the project team; a contingency percentage alone cannot establish the repair cost.

Does this planner calculate the cost of my renovation?

It totals the allowances you enter; it does not predict market construction prices or provide a quote. Use figures supported by your scope, available quotes and professional advice. Items without a confirmed allowance should remain blank so the gaps stay visible.

Which costs should I include beyond the builder’s quote?

Review design and consultant fees, approvals and inspections, utility upgrades, demolition and disposal, site preparation, relocation or storage and other project allowances. Only add a cost separately when it is not already included in your construction allowance.

How should I handle GST in my budget?

Use a consistent GST basis for the amounts you enter and select whether they include or exclude GST. If the basis is mixed or unconfirmed, identify that uncertainty before comparing totals. The planner does not determine your tax position or tax savings.

What contingency percentage should I choose?

The planner lets you choose your own allowance from 0 to 100 per cent and apply it to construction only or all entered costs. It does not prescribe a suitable rate. Your project scope, unresolved conditions and advice from the project team should inform the allowance.

Should an unknown cost be entered as zero?

Leave an unknown cost blank. Enter zero only when the item is confirmed as not applicable or already allowed for elsewhere. This keeps an unresolved cost from looking as though it has been checked and excluded.

Does creating a budget send my information to SCE?

No. The planner keeps your answers in the current tab and does not submit them automatically. You can copy or print the summary. The optional review link carries the summary to Contact SCE, where you choose whether to submit an enquiry.