Construction quote comparison tool NSW
Set two construction quotes side by side and compare what each contractor has actually priced. Record exclusions, allowances, access provisions and the evidence due at handover. The questions you generate can be sent to both tenderers so the committee or owner can compare their replies on the same basis.
Use the same drawings, quantities and scope for both quotes. Blank prices stay unconfirmed. This tool highlights differences; it does not score contractors or identify a best-value winner.
No login or email required. The tool keeps your answers in this tab. Choose the optional review link to carry the summary to Contact SCE; nothing is submitted automatically.
Quote A
Use a reference such as Quote A. No contact details or confidential tender documents are needed.
Leave blank if not supplied. Numeric maximum: $1 billion.
Only add your own allowance for costs excluded from the quote. Enter 0 if none; do not repeat amounts already included.
Compare the written scope
Quote B
Use a reference such as Quote B. No contact details or confidential tender documents are needed.
Leave blank if not supplied. Numeric maximum: $1 billion.
Only add your own allowance for costs excluded from the quote. Enter 0 if none; do not repeat amounts already included.
Compare the written scope
This planner needs JavaScript to build your comparison brief. You can also contact SCE to discuss your project.
Your summary
Plan the next step with SCE
If the offers were prepared against different information, start with the scope-of-works brief guide. For returned strata remedial tenders, follow the remedial tender comparison checklist.
SCE Corp combines engineering, design coordination, procurement, construction and handover planning when reviewing a project scope. We check how the proposed work will actually be built, including access, material suitability and approval requirements. Share the location, scope and available project records to discuss your next step.

Construction quote comparison FAQs
Our construction budget and quotation questions explain how to compare scope, allowances and exclusions alongside your planning figures.
Why can two quotes for the same building differ so much?
The prices may assume different access methods, materials, investigations or responsibilities. SCE has checked council access requirements before pricing work and found that a proposed scaffold arrangement could not be used. A quotation based on that arrangement would need clarification before it could be compared with an achievable method. Coastal projects also need the proposed cladding system and finish assessed for the actual exposure. Ask each contractor to identify these assumptions, exclusions and allowances in writing. Our façade access planning guide explains the access questions to resolve before comparing prices.
How do I compare two construction quotes fairly?
Start with the same drawings, quantities and scope, then compare what each quote includes and excludes. Record the GST basis, provisional items, access arrangements, approvals, programme, testing and handover. Differences should become written clarification questions before you compare the overall offers.
Does the tool tell me which contractor to choose?
No. It highlights scope and price-basis differences and prepares a comparison brief. It does not score contractors or select a best-value winner. Contractor capability, project fit and the clarified written terms still need to be assessed.
How should excluded costs be entered?
Add only your own allowance for costs excluded from each quote. Do not repeat amounts already included in the quoted price. Leave unconfirmed prices blank and identify the information you need from the contractor.
Why should provisional sums and prime-cost items be checked?
They can leave parts of the final cost dependent on later information or selections. Record how each quote describes those items, what is allowed for and what remains uncertain. Ask the contractor to explain the allowance and how a change would be handled.
What if the quotes use different GST or scope assumptions?
Mark the differences as unconfirmed and ask for clarification before treating the totals as directly comparable. The tool records those gaps; it does not resolve tax treatment or make unlike construction scopes equivalent.
Do I need to upload confidential tender documents?
No. Use a reference such as Quote A or Quote B and enter only the information needed for your comparison. No login or email is required. The summary stays in the tab unless you choose to copy, print or carry it to the optional Contact SCE review form.