The Peak Apartments · Haymarket NSW

Haymarket Water-Damage Insurance Restoration Project

Project documentation for The Peak Apartments records an occupied-building restoration scope following water damage. SCE’s works covered apartment ceilings, flooring and skirtings, tiling, cabinetry, appliances and coordinated electrical and plumbing activities.

Verified project media

Same-project restoration evidence

The images below are retained as distinct evidence: the interior composite shows before-and-after apartment work, while the exterior image identifies the Haymarket building context.

Before-and-after apartment restoration works at The Peak, Haymarket
Before-and-after project evidence from SCE Corp’s documented water-damage restoration scope at The Peak Apartments, Haymarket.
The Peak Apartments building in Haymarket
The Peak Apartments, site of SCE Corp’s documented Haymarket water-damage restoration project.
Project context

Restoration planning for occupied apartments

SCE’s project methodology identifies a coordinated programme of repair and reinstatement work across several occupied units. The documented approach addressed resident access, furniture protection, material movement through the goods lift and trade sequencing within an operating apartment building.

Evidence boundary: this page presents SCE’s documented Haymarket restoration scope. It does not present unrelated heritage-upgrade work, certification claims, insurance-policy outcomes or the separate 2 Quay Street bathroom project.

Documented work package

Scope and coordination controls

The project methodology records the following workstreams and controls.

Ceilings and plasterboard

Removal of damaged ceiling material, replacement plasterboard and coordinated painting, including documented fire-rated requirements where applicable.

Flooring and skirtings

Removal of water-damaged finishes, replacement flooring in 17 units to match existing finishes and reinstatement of damaged skirtings.

Cabinetry and appliances

Removal, protected storage and reinstatement of dishwashers, with damaged vanity, kitchen or kickboard work addressed where required.

Tiling and waterproofing

Wall-tile work and waterproofing tests were coordinated before tiling where the documented apartment scope required them.

Electrical and plumbing

Relocation or checking of affected electrical services and appliances, together with reinstatement of plumbing fixtures after repair work.

Resident and site controls

Access scheduling, furniture protection, goods-lift logistics and trade sequencing were planned around occupied apartments.

Relevant SCE pathways

Continue from project evidence to the right service

Project FAQs

Haymarket restoration questions

What work did SCE document for The Peak Apartments?

SCE’s documented methodology identifies The Peak Apartments in Haymarket and records a water-damage restoration scope across several occupied units, including ceilings, flooring, skirtings, tiles, cabinetry, appliances and service coordination.

What caused the restoration works?

The project documentation records water-damaged flooring and skirtings, ceiling works and other repairs associated with flooding. This page does not make a broader cause, loss-value or insurance-policy claim.

How were occupied apartments considered?

The methodology required residents’ availability to be coordinated, furniture to be protected and material movement to use the goods lift. Those controls helped organise work around occupied apartments.

What ceiling works were included?

The documented ceiling scope included removing damaged plasterboard, installing replacement plasterboard and coordinating painting. Fire-rated plasterboard requirements applied where documented for shared walls or ceilings.

What flooring and skirting works were included?

The documented scope included removing water-damaged flooring and skirtings, installing replacement flooring in 17 units to match existing finishes and replacing damaged skirtings with the same profile.

What kitchen, laundry and cabinet works were included?

The methodology covered removal, storage and reinstatement of dishwashers, replacement of damaged vanities or kitchens where required, owner approval of materials and replacement of old kickboards to match.

What electrical, plumbing and tiling coordination was included?

The documented coordination included relocating electrical services, checking affected fittings and appliances, reinstating plumbing fixtures, waterproofing tests before tiling and wall-tile works where required.

Does this page replace SCE’s Insurance Services information?

No. This page is project evidence for the Haymarket works. SCE’s Insurance Services page remains the broader service owner for insurance make-safe, repair and restoration enquiries.

Discuss an insurance repair or restoration requirement

Share the site location, damage context and current access constraints so SCE can direct your enquiry to the appropriate team.