The work comprised five connected stages, bringing manufacture, installation and final fittings into one window replacement package.
Check the registered strata plan and by-laws to establish who maintains the frame, glazing and fittings. The Greenwich package combined replacement windows, blinds and child locks.
At 20 years, condition is more informative than age. Check operation, water entry, seals and whether parts are obtainable. A replacement brief should also identify blinds, locks and internal repairs. At Greenwich those accessories were part of the completed window package.
01
Measure and Manufacture
The windows were measured and manufactured to suit the project.
What is the average cost to replace 14 windows?
Measure each opening and group units by size, operation and access height. Include removal, making good, blinds and locks when seeking prices; a window count cannot price the Greenwich-style scope.
How much does it cost to replace window glass in Australia?
A glazier will price the pane dimensions, glass specification, safe access, removal and installation. A full window replacement has additional items such as frames and making good. At Greenwich the package also included measurement, manufacture, blinds and child locks, so it is a different comparison.
02
Remove Old Windows
The old windows were removed and disposed of as the replacement work progressed.
How to manage construction and demolition waste?
Plan the removal route for old windows, protect shared access and separate glass and framing for suitable handling or recovery. Coordinate the sequence with temporary weather protection.
Is it cheaper to replace a whole window or just the glass?
Glass-only work is usually a smaller scope when the frame, seals, hardware and surrounding opening are all sound. A failed frame or widespread operational problems can make whole-window replacement more appropriate. In Greenwich, manufacturing and installation were coordinated across a block of units.
03
Install New Windows
The new windows were installed in the project areas shown in the completed photographs.
Do exterior windows need flashing?
The installation needs a detail that manages water at the head, jambs and sill. Verify those interfaces against the particular frame and wall before finishes conceal them.
Can you replace just the frame of a window?
It can be possible if the existing glazing is sound and compatible with the proposed frame and installation method. A glazier must assess it before promising reuse. The Greenwich package involved manufactured replacement windows, so confirm precisely what a frame-only quote would retain.
04
Install Blinds
Blinds were installed at the relevant window and glazed openings included in the scope.
05
Fit Child Locks
Child locks were fitted to the replacement windows documented in the project photographs.
What is checked during a site inspection?
Check window operation, child-lock engagement, clearances and blind operation at each opening. Use an opening schedule so a missed fitting can be traced to the correct unit.
The completed window package included the replacement windows, blinds and child locks.