Access and staging
Defined work zones, traffic arrangements and pedestrian routes supported staged construction within the urban corridor.
Project scope
The West Ryde works form part of Farshid MANESH’s wider career experience, contributing to the civil engineering, estimating, construction planning and operational leadership he brings to SCE. The project included excavation, trenching, new stormwater lines, reinforced concrete pit works, utility relocation and pavement reinstatement.
Delivery was staged around existing roads, footpaths, utilities and drainage flow paths. The work sequence combined civil construction activities with traffic, pedestrian and environmental controls.
Delivery controls
Defined work zones, traffic arrangements and pedestrian routes supported staged construction within the urban corridor.
Quality controls included survey set-outs, hold points, density testing, CCTV inspection and closeout documentation.
Sediment, dust and dewatering controls were applied to suit the site conditions and work sequence.
Project photographs
The project photographs show a stormwater pit in the excavated work area and the reinstated pavement surface after civil works.
The combined scope connected the drainage works below ground with reinstatement of the road surface above. For a different pavement and access-staging example, see SCE’s Blackbutt road reconstruction.
Related projects and services

Review related SCE project pages covering civil infrastructure delivery.
View Civil Infrastructure Projects
See the Epping–Thornleigh project profile for related stormwater and civil-works experience behind SCE.
View Epping–Thornleigh Stormwater Works
Explore SCE’s civil engineering, construction and project delivery capability.
Explore Civil ServicesYou can also review the SCE System and SCE’s qualifications, certifications and insurance, or return to the SCE Projects directory.
Frequently asked questions
For related drainage, structural and site-interface decisions, explore our civil drainage and structure questions.
The scope included pavement removal, trench excavation, stormwater-line installation, pit upgrades, utility coordination, traffic controls and pavement reinstatement.
The project involved new stormwater lines, reinforced concrete pit works and upgrades to existing stormwater pits.
The project involved stormwater lines up to 1300 mm in diameter.
Staged work zones, traffic arrangements and pedestrian routes helped maintain access around the civil works.
Utility coordination and relocation formed part of the scope so the drainage works could proceed through the active corridor.
Quality controls included survey set-outs, hold points, density testing, CCTV inspection and closeout documentation.
The image shows a stormwater pit within the excavated work area and pavement reinstatement after the civil works.
Use the SCE contact page to share the location, known drainage scope, access constraints, existing services and required project timeframe.
Plan the next step
Share the location, drainage plans, known services, site photographs, access constraints and programme so SCE can plan the engineering and construction package through testing and handover. Our project planning tools help organise the brief.