Document control
Record the current drawings, specifications, schedules, approved variations and the dates or revisions used for construction.
Informational guide to construction evidence and close-out
Cladding installation records provide traceability for products, substrates, interfaces, inspections, variations and defects. They do not replace design, declarations, certification or statutory decisions, but they help owners, consultants and contractors understand what was delivered within the documented construction scope.
Many façade details become difficult or impossible to inspect after panels are installed. The project should identify the required records before work begins rather than trying to recreate evidence at handover.
Record the current drawings, specifications, schedules, approved variations and the dates or revisions used for construction.
Retain delivery information, product identification, finish, batch or order records and any project-required supporting documents.
Photograph and record visible substrates, supports, tolerances, existing damage and latent conditions before concealment.
Capture the agreed checks for fixings, joints, flashings, membranes, penetrations, cavity details and adjacent construction.
Link site conditions and instructions to the relevant approved change rather than relying on informal or undocumented decisions.
Record identified defects, corrective work, reinspection and acceptance where the contract requires it.
Record product identity, quantity, finish, damage and storage conditions.
Capture supports, dimensions, tolerances and latent conditions before concealment.
Record agreed flashings, membranes, penetrations, joints and cavity details.
Inspect alignment, joints, finish, damage, protection and identified defects.
Compile approved variations, inspection evidence, close-out and maintenance information.
Records can show what was delivered, observed and inspected within the recorded scope. They can support warranty discussions, maintenance planning, future investigations and project close-out.
They do not independently establish that an entire building is safe, certified or fully compliant. Those conclusions depend on the applicable design, approvals, testing, declarations, certification and building-specific circumstances.
Existing buildings may contain undocumented changes, damaged substrates or dimensions that differ from the available information. The affected condition should be recorded, and the required instruction or revised detail should be obtained from the appropriately appointed party.
SCE Corp is NSW DBP registered. Where the framework applies, SCE ensures the construction work within its contracted control follows the approved designs, declarations, specifications, approvals and project requirements.
Registered-design, declaration, certification and statutory responsibilities remain with the appropriately appointed practitioners and authorities.
This article owns the informational topic of installation records and handover evidence. It does not replace the commercial service or non-compliant cladding assessment pages.
Related reading: cladding defects and water-ingress warning signs and how cladding installation is planned and checked. Review current service locations.
The required evidence remains project-specific and depends on the contract, building, system and appointed parties.
Cladding work contains interfaces that may become concealed. Records help demonstrate what product was delivered, what conditions were observed, which details were followed, what inspections occurred and how defects or variations were closed out.
Record the current documents, system information, delivery condition, substrates, tolerances, access, samples, existing damage, latent conditions and the agreed inspection or hold points.
Photographs are commonly useful before concealment of supports, brackets, membranes, flashings, cavity interfaces, penetrations and other details identified in the inspection plan. The required evidence remains project-specific.
The appropriately appointed designer, registered practitioner, consultant, superintendent, certifier or other authorised party must deal with changes within their responsibility. The contractor should record the issue and wait for the required instruction before proceeding at the affected interface.
Depending on the contract, it may include product records, approved variations, inspection evidence, photographs, test information, defect close-out, warranties provided by the relevant parties, maintenance requirements and as-built or marked-up information.
No. Construction records support traceability for the recorded scope, but whole-building compliance, certification and statutory conclusions depend on the relevant design, approvals, inspections, declarations and appointed parties.
An assessment pathway should be considered where existing materials or approvals are unknown, a notice or report raises concerns, combustible cladding is suspected, or the proposed work depends on confirming the existing wall system before construction planning.