Client or developer
Sets the brief, appointments, commercial pathway and governance. The client team should confirm whether the work is regulated and ensure the programme allows for compliant design, declarations and lodgement.
The Design and Building Practitioners framework affects who may prepare declared designs, who lodges project documents, how variations are controlled and what must be ready before regulated work starts or an occupation certificate is sought.

The NSW Design and Building Practitioners Act 2020 and its supporting regulation create defined responsibilities for regulated designs, declarations, registration and document lodgement on regulated building work. Current NSW Government guidance identifies class 2, certain class 3 and class 9c buildings, including relevant mixed-use buildings, within the scheme. Scope, exemptions and transitional arrangements can vary, so the exact building class, work and approval pathway must be checked for each project.
New construction and remedial work have different transition rules. Current NSW guidance states that alteration, repair and renovation work on existing Class 3 and 9c buildings remains excluded from the DBP scheme until 1 July 2028. Existing Class 2 remedial work is already covered unless an applicable exclusion applies. Check the current remedial-work rules against the actual scope.
For a client or delivery team, the practical effect is simple: role appointments, design maturity, declaration status, variation control and Planning Portal records cannot be treated as end-of-project paperwork. They influence procurement, programme, site release and handover from the start.
For a fuller explanation of the scheme, scope and terminology, use SCE's DBP Act NSW guide and confirm current requirements through Building Commission NSW guidance.
Sets the brief, appointments, commercial pathway and governance. The client team should confirm whether the work is regulated and ensure the programme allows for compliant design, declarations and lodgement.
Prepares regulated designs and makes design compliance declarations only within the registration and competency relevant to that design. Different design disciplines may require different registered practitioners.
For regulated building work, the appointed building practitioner has duties that include ensuring required regulated designs and declarations are lodged before related work starts and making the final building compliance declaration.
Performs statutory certification functions and checks the documents required for the relevant certificate. The certifier does not replace the design or building practitioner and should not be described as the project designer or builder.
Yes. Where a development uses more than one construction certificate, the regulated designs and design compliance declarations relevant to each certificate must be lodged before work under that certificate starts. Define the design, lodgement and inspection requirements for each stage, including its interfaces with later work. Staging does not permit a trade to start its regulated work from an incomplete or undeclared design.
NSW Government guidance separates obtaining a varied design from lodging it. The building practitioner must obtain the new or updated regulated design and declaration before the affected work starts, then lodge the variation documents within one day of starting that work. Put both steps into the construction programme and document register.
Start with an identifiable change record: the location, affected drawing and revision, photographs, proposed change and the work awaiting a decision. The relevant registered design practitioner assesses the design implications. Where a regulated design changes, the required revised design and declaration must be ready before the affected work proceeds, with lodgement handled through the prescribed process.
Then update procurement instructions and the construction drawing register so suppliers and installers work from the same current detail. Record what can proceed independently and what must wait. A client approving a price variation does not, by itself, approve a technical design change.
During the Belmont recladding works, SCE queried whether the specified replacement self-tapping screws would provide a secure fixing in the existing locations. The appointed designers revised the detail to use larger screws where suitable or additional supporting members where that option was unavailable. SCE’s role was to raise the construction query and build the resolved detail against the principal-procured design, keeping the designer’s decision and the site work connected.
A strong delivery plan connects these controls to ordinary project management. That means one current drawing register, clear revision status, recorded approvals, disciplined requests for information and a handover plan that begins before site completion.
SCE is a DBP-registered building practitioner with qualified building, civil and construction engineering capability. Our qualified team and appointed specialists deliver engineering, design, procurement, construction, testing, certification and handover. Buildability review, variation control and quality records connect those disciplines through the construction sequence. Project appointments identify the registered practitioners responsible for each regulated discipline.
A clear responsibility matrix connects SCE's construction management with each appointed practitioner's design, declaration and lodgement duties. Independent certification remains with the registered certifier. Record the responsible person and required deliverable before releasing each stage.
Review SCE's building services and the SCE System for an organised approach to scope, coordination, delivery and handover.
Use the SCE project hub to explore published work, then confirm the exact team, registrations and project-specific responsibilities during procurement.
What is the building classification, which part of a mixed-use building is affected, what work is proposed and do any exemptions or transitional provisions need specialist confirmation?
Which registered practitioner prepares and declares each design, who is the building practitioner, is a principal design practitioner appointed and who completes each lodgement?
Which construction-issued documents, declarations, approvals and portal records must be complete before a trade, stage or variation can proceed?
SCE's planning tools can support early project thinking, but project-specific legal, design, certification and registration advice should come from the appropriately qualified and appointed parties.
Our approval and practitioner-role questions explain the project information and responsibilities to resolve before construction.
Yes. Where a development uses more than one construction certificate, the regulated designs and design compliance declarations relevant to each certificate must be lodged before work under that certificate starts. Define the design, lodgement and inspection requirements for each stage, including its interfaces with later work. Staging does not permit a trade to start its regulated work from an incomplete or undeclared design.
The framework strengthens accountability for regulated designs and building work by defining practitioner registration, declaration and lodgement duties. It is intended to improve the traceability and compliance of work on regulated buildings.
The scheme covers Class 2 and certain Class 3 and 9c work, including relevant mixed-use buildings. New construction and work to existing buildings have different rules. Current NSW guidance excludes alteration, repair and renovation work on existing Class 3 and 9c buildings until 1 July 2028. Check the building class, work type and applicable exclusions for the actual project.
A registered design practitioner prepares a regulated design and makes the related design compliance declaration within the practitioner's authorised registration class. The building practitioner or an eligible appointed practitioner then handles the required lodgement pathway.
Required construction-issued regulated designs and design compliance declarations must be obtained and lodged through the prescribed pathway before the related regulated building work starts. Project teams should make this a documented construction-release gate.
For a change affecting a building element or performance solution, the building practitioner must obtain the new or updated regulated design and design compliance declaration before the varied work starts. Current NSW guidance then requires the variation documents to be lodged within one day of starting that varied work. Changes outside those categories still need assessment and the required variation statement. Record the technical decision separately from the client’s commercial approval.
Yes. SCE is a DBP-registered building practitioner with qualified building, civil and construction engineering capability. Our team and appointed specialists deliver engineering, design, procurement, construction, testing, certification and handover. Each regulated design, declaration and certification duty is allocated to the practitioner registered and appointed for that role, with independent statutory certification kept separate.
Bring the building classification, proposed scope, consultant appointments, approvals and current design register to an early delivery discussion. SCE reviews the construction interfaces, coordinates the delivery requirements and develops a practical project pathway.
Important: this article is general construction information, not legal, design or certification advice. Requirements can change. Confirm the current position for the exact project with Building Commission NSW, the certifier and appropriately registered practitioners. Official references: building practitioner obligations and the Design and Building Practitioners Act 2020.