Watch this 27-second record of the later Hunters Hill work sequence, from site establishment and excavation through sandstone pedestrian access and vehicle-crossing completion.
From site preparation to sandstone access
- Site establishment and preparation for the documented external works.
- Excavation associated with the sandstone-access scope.
- Construction and completion of pedestrian-access and vehicle-crossing elements.
A connected external-works package
SCE delivered the demolition, excavation, access construction, make-good work and landscaping as a connected package at the occupied Hunters Hill property. The later sequence shown here brought site establishment, erosion and sediment controls, sandstone pedestrian access and the vehicle crossing together before surrounding-area reinstatement.
What needs to be planned before sandstone access works?
Confirm the existing levels, drainage, ground conditions, buried services, construction access and interfaces with retained surfaces. At Hunters Hill, work was staged around the occupied residence, confined access and existing kerb. The plant and handling approach need to suit those constraints; a larger machine is not automatically the most practical choice.
Explore detailed excavation and earthworks, concreting and underground services, or compare the separate Normanhurst driveway replacement. Use the occupied-building works planner to record how residents will reach the property during construction.
Our Hunters Hill services and credentials explain the wider capability. Send SCE the site photographs and proposed scope so our engineering and building team can plan design inputs, approvals, procurement, construction and handover for your work.
Hunters Hill sandstone-access video FAQs
Read our civil access and delivery questions for the planning decisions behind constrained access works.
What does the Hunters Hill video cover?
The 27-second video records the later work sequence: site establishment, preparation and excavation, followed by sandstone pedestrian-access and vehicle-crossing construction and completion.
Does the video cover every stage or earlier work at the property?
The video shows the later stage of the Hunters Hill access works. For the full scope and earlier work at the property, see the linked project case study.
What was SCE’s responsibility on the access works?
SCE delivered the connected demolition, excavation, sandstone access, make-good and landscaping package. The work was staged around the occupied residence and retained elements. Design, approval, inspection and certification responsibilities were allocated to the appropriate practitioners and authorities for the scope.