Transport infrastructure decarbonisation

What Is the Sustainable Infrastructure Program in NSW?

The Sustainable Infrastructure Program is a Transport for NSW initiative developed with industry to drive decarbonisation and circularity across Transport’s infrastructure lifecycle, from early business cases and procurement through design, construction, operation, maintenance and end of life.

Workers installing screw piles for the flood-damaged bridge reconstruction in Emu Heights
SCE screw-pile installation at the Emu Heights bridge reconstruction.

NSW programme guidance checked: 8 November 2026

The short answer

Transport for NSW launched the Sustainable Infrastructure Program (SIP) in 2023 as a practical pathway for Transport and its industry partners to reduce infrastructure-related emissions and move towards a circular asset model. The program is aligned with Transport’s Net Zero and Climate Change Policy and the broader NSW Decarbonising Infrastructure Delivery Roadmap.

SIP is not a general sustainability grant, a single planning approval or a blanket requirement for every project in NSW. Its requirements and tools are relevant to Transport’s capital program and delivery partners, while other NSW Government policies and project contracts may create separate carbon-management obligations.

Project requirements remain specific. Delivery teams should read the tender, deed, Transport standards, technical criteria and reporting requirements for the actual package rather than assume every SIP tool or target applies in the same way.

SIP’s five workstreams

1

Net Zero Procurement

Place carbon alongside cost, schedule, risk and other decision factors through procurement.

2

Engineering and Innovation

Reform design and engineering decisions to reduce both carbon and cost where feasible.

3

Development Phase

Use carbon values in business cases and address high-impact decisions early in the asset lifecycle.

4

Construction Phase

Accelerate lower-emission plant, equipment and modern construction methods where suitable.

5

Systems and Alignment

Align processes, data and requirements across Transport so delivery teams can work consistently.

How the program turns policy into delivery tools

Transport’s published SIP material identifies a digital and technical ecosystem designed to make carbon and sustainability information usable in project decisions. It includes Miraway, which Transport describes as a digital ecosystem for planning, building and managing infrastructure. Teams should confirm the tools, data format and reporting responsibilities specified for their package.

Cost and carbon dataThe Engineering Cost and Carbon Library links construction resources to baseline carbon data and a consistent classification approach.
Concrete informationGlobal Warming Potential data in the Concrete Mix Register supports more transparent mix comparison and approval decisions.
Management guidanceCost and Carbon Management guidance integrates carbon into familiar cost-management and engineering processes.
Common digital languageThe Infrastructure Common Data Model is intended to support consistent information exchange across cost, schedule, risk and environmental, social and governance dimensions.
Sustainable outcomesValuing Sustainable Outcomes guidance is designed to help project teams compare broader social, economic, environmental and governance outcomes.

How SIP relates to wider NSW infrastructure policy

Transport for NSW SIP

A Transport-focused program for decarbonisation, circularity, digital tools, procurement and delivery change across Transport’s infrastructure lifecycle.

Decarbonising Infrastructure Delivery Policy

An Infrastructure NSW policy setting expectations for managing and reporting upfront embodied carbon on major NSW Government projects. Infrastructure NSW states it applies to building projects over $50 million and linear infrastructure over $100 million.

Measurement Guidance

A common method for agencies and industry to measure embodied emissions consistently, including aligned assumptions and reporting conventions.

2024–2026 Roadmap

A coordinated Infrastructure NSW and Transport for NSW workplan covering policy implementation, tools, capability, data and the progressive expansion of whole-life carbon management.

What delivery partners should prepare

Read the contract

Identify the exact carbon, circularity, data, reporting, design and construction obligations in the package.

Find hotspots

Establish the relevant baseline and focus design effort on materials, quantities, plant, logistics and activities with material impact.

Test alternatives

Compare options for constructability, safety, durability, cost, carbon, program and operational performance.

Verify delivery

Record approved products, quantities, suppliers, waste flows, plant use, changes and evidence required for reporting.

  • Engage designers, estimators, procurement and construction teams early.
  • Keep carbon assumptions, data sources and boundaries consistent and traceable.
  • Confirm that alternative materials and methods satisfy performance and approval requirements.
  • Plan staging and logistics to reduce rework, idle plant, double handling and unnecessary haulage.
  • Prioritise waste prevention and reuse before relying on disposal or offset-style claims.
  • Track changes so claimed reductions can be reconciled with the delivered asset.

Where SCE can support delivery

Sydney Contracting Engineers combines qualified engineering and construction expertise across building and civil work. Our team and specialist partners deliver engineering and design, procurement, construction, testing, certification and handover as a coordinated package, with material options, logistics and environmental controls assessed together. We define the project’s reporting and verification requirements early so the selected solution can be traced through to the delivered work.

Our ISO-certified quality, environmental and safety systems cover building and civil works. We define the required performance, approvals, supply-chain evidence and measurement method at the outset, then document decisions through delivery. A carbon-reduction claim needs a measured baseline and supporting evidence for that project.

Review SCE’s civil services, delivery system, project experience and project tools.

How early investigation improves construction decisions

On SCE’s Emu Heights bridge reconstruction, the team reviewed the proposed foundation solution with design, geotechnical and construction specialists. Ground investigation identified shallower rock than had been assumed, while groundwater remained a critical consideration. This allowed the design to be reconsidered against the actual site conditions before construction.

The practical lesson is to test the assumptions behind quantities and methods early. SCE brings the right disciplines together, reviews buildability and develops alternatives that meet the client’s requirements. The Emu Heights example demonstrates that process; it is not presented as a SIP-funded project or a measured carbon-saving case study. Explore SCE’s road and bridge delivery and building and civil capabilities.

Frequently asked questions

For related questions about scope, site information and delivery, read our civil construction planning questions.

What is the Sustainable Infrastructure Program in NSW?

It is a Transport for NSW program developed with industry to support decarbonisation and circularity across Transport infrastructure, using procurement, engineering, digital tools and lifecycle decision-making.

Does SIP apply to every infrastructure project in NSW?

No. SIP is a Transport for NSW program. The requirements for a project depend on its agency, contract, value, asset type and applicable policies. Separate Infrastructure NSW carbon policy applies to defined major government projects.

What are SIP’s five workstreams?

They are Net Zero Procurement; Net Zero Engineering and Innovation; decarbonising the development phase; decarbonising the construction phase; and cross-cluster systems, processes and alignment.

How does SIP relate to the Decarbonising Infrastructure Delivery Policy?

SIP is Transport’s delivery program. The separate Infrastructure NSW policy sets expectations for upfront embodied-carbon management and reporting on major NSW Government building and linear-infrastructure projects.

What information may delivery partners need to provide?

Contract-specific requirements can include baselines, quantities, material and supplier data, plant and energy information, waste flows, option assessments, approved changes and evidence supporting reported outcomes.

What is Miraway in the Sustainable Infrastructure Program?

Miraway is Transport for NSW’s digital ecosystem for planning, building and managing infrastructure with sustainability information at its core. It sits alongside SIP’s cost, carbon and engineering tools. Delivery teams should confirm which systems, data formats and reporting duties their contract requires.

How can construction teams reduce infrastructure carbon?

Teams can address carbon early, reduce material demand, compare lower-impact options, improve logistics and plant use, prevent waste, reuse suitable materials and verify what was actually delivered. Safety, durability and approvals remain essential.

Current official references

The Transport for NSW SIP and Infrastructure NSW programme pages were checked on 8 November 2026. Infrastructure NSW continues to list the May 2025 roadmap for 2024 to 2026 and the linked delivery policy. Use the current tender and contract documents for a live project.