Fallen-tree and debris removal
The scope included removal of the fallen tree and removal of debris from the works. The project photographs show tree material, removed roof timbers and tiles, and debris collected for removal.
Storm damage · Grays Point NSW
SCE delivered a substantial make-safe package for NRMA Insurance at a storm-damaged boat shed in Grays Point. The works brought together fallen-tree removal, asbestos removal and disposal, temporary wall and roof propping, gradual roof removal and debris removal.
The assignment involved supporting the remaining structure while dismantling the damaged roof and removing the affected materials.

SCE’s work covered the fallen tree, asbestos, temporary support, damaged roof structure and debris. These elements formed one coordinated make-safe package for the storm-damaged building.
The scope included removal of the fallen tree and removal of debris from the works. The project photographs show tree material, removed roof timbers and tiles, and debris collected for removal.
Removal and disposal of asbestos was a defined part of SCE’s make-safe package. This work sat alongside structural support and roof removal within the overall assignment for NRMA Insurance.
SCE temporarily propped the walls and roof structure and gradually removed the roof structure. The temporary support and dismantling work addressed the damaged boat shed as the roof was taken down.
The photographs record the damaged roof, wall support, removal of roof materials and debris handling. The final view shows the remaining walls after the roof was removed, with temporary support still in place.
This project demonstrates SCE’s ability to combine structural support, asbestos removal and dismantling within a substantial make-safe scope.
Temporary propping and the removal sequence had to be considered together: taking down the damaged roof changed what remained to be supported. The final image records that make-safe stage, with the walls retained under temporary support.
Select a photograph to view it at full size.





The Grays Point boat shed required a response covering several parts of the damaged structure. SCE delivered the full make-safe package for NRMA Insurance, from fallen-tree and asbestos removal through temporary propping, gradual roof removal and debris clearance.
Explore our insurance repair and make-safe projects, the Greater Sydney make-safe programme and our Emergency Make-Safe Works service.
Compare this boat shed scope with our separate Grays Point fallen-tree make-safe project for Tandem, which combined roof propping, temporary covering and boarding of damaged openings. See our guide to the handover from temporary roof protection to permanent repairs for the next-stage planning questions.
Our licences, registrations and certifications support SCE’s combined engineering and construction delivery.
For local project enquiries, explore our Sutherland Shire service coverage.
For related questions about the approved scope, records and repair responsibilities, see our insurance repair planning questions.
SCE removed the fallen tree, removed and disposed of asbestos, temporarily propped the walls and roof structure, gradually removed the roof structure and removed debris. The make-safe project was delivered for NRMA Insurance in Grays Point, NSW.
The scope combined temporary propping of the walls and roof with gradual removal of the roof structure. The photographs record the damaged roof, temporary wall support, removed roof materials and the remaining walls after roof removal.
Yes. Removal and disposal of asbestos formed part of SCE’s boat shed make-safe scope, alongside fallen-tree removal, temporary structural support, gradual roof removal and debris removal.
The delivered package covered tree and asbestos removal, temporary support, gradual roof removal and debris clearance. The final project view shows the remaining walls held with temporary props after the roof was removed. Permanent rebuilding is a separate stage: its scope needs to account for the retained structure, engineering design, approvals and the insurer’s authorised works. SCE can manage the engineering and construction requirements through to inspection and handover for the agreed reinstatement scope.
Use the website enquiry form to share the property location, known damage, access constraints, photographs taken from a safe position and any insurer or engineer’s instructions. SCE can assess the required support, removal and protection works, coordinate the appropriate specialists and plan the agreed repair stages.