1Use fit and asset strategy
Define occupancy, spatial, operational, accessibility, resilience, energy, amenity and service-life requirements. An attractive concept can still fail if the existing grid, floor-to-floor height, loading, access or circulation does not support the intended use.
Evidence: owner’s brief, accommodation schedule, measurable performance criteria and future-change assumptions.
2Heritage and planning pathway
Check the State Heritage Inventory, local planning controls, conservation areas, existing approvals and the proposed impact. Heritage NSW explains that work with moderate or greater potential impact on a State Heritage Register item may require a Section 60 application unless another pathway applies.
Evidence: listing, statement of significance, planning advice, heritage impact pathway and authority requirements.
3Measured condition and hidden risk
Separate observation from verification. Water ingress, corrosion, timber decay, movement, prior alterations and concealed connections can materially change both options. Plan investigations so they answer defined decisions without causing uncontrolled damage.
Evidence: records, measured survey, condition mapping, intrusive inspection, tests, samples and a limitations register.
4Structure, geometry and temporary stability
Review the existing system, load paths, capacity, movement, proposed openings and sequencing constraints. Partial removal can be more interface-heavy than either full retention or full demolition, especially when temporary support and façade retention are involved.
Evidence: structural investigations and options by the appointed engineer, plus buildability and access input.
5Services, fire safety and accessibility
Existing risers, plant areas, ceiling zones and penetrations may not support the proposed use. Coordinate fire, hydraulic, electrical, mechanical, communications, accessibility and energy requirements as one option—not isolated allowances.
Evidence: services audit, fire and accessibility strategies, code assessment, spatial coordination and upgrade scope.
6Hazardous materials and environmental controls
Demolition and opening-up can expose asbestos, lead coatings, silica, contaminated material or other hazards. Do not treat building age or appearance as proof. Define survey limitations and the response to unexpected finds.
Evidence: competent hazardous-material assessment, registers, sampling where required, waste pathways and controls.
7Access, staging and continuity
Occupied neighbours, live operations, limited laydown, noise windows, public interfaces and restricted plant access can dominate feasibility. Compare decant, protection, temporary services and handback requirements across all options.
Evidence: site logistics, staging diagrams, operational constraints, temporary works concepts and stakeholder interfaces.
8Cost, programme and whole-life evidence
Show exclusions, provisional quantities, contingencies, escalation, approval durations, investigation allowances, retained-life assumptions, disposal routes and operational impacts. Carbon and waste benefits should use transparent boundaries rather than slogans.
Evidence: comparable option scopes, risk-adjusted estimates, programmes, sensitivity tests and stated study boundaries.