Plan and establish access
The work area and temporary scaffold access were established for controlled removal of the elevated structure.
Completed strata project · Lane Cove North, NSW
SCE Corp delivered scaffolded access, controlled removal of a decommissioned elevated footbridge, removal from site and make-good and render repairs at the former building connection areas.
Project overview
The project involved a decommissioned footbridge adjoining an occupied residential property. The work required planned access, separation of the demolition activity from surrounding areas, controlled dismantling and careful management of the former building interfaces.
SCE’s construction scope was completed using temporary scaffold access. Removed materials were taken from site, and the former connection areas were made good with render repairs. The exact property address and client identity are withheld.
SCE Corp managed the demolition sequence, scaffold access, removal logistics and reinstatement of the former bridge connections within the existing strata property. Our residential demolition planning guide explains how removal limits, retained structures and the finished handover condition are defined for a new project.
Delivery sequence
The work area and temporary scaffold access were established for controlled removal of the elevated structure.
The decommissioned footbridge was progressively dismantled using the planned access arrangement and controlled work sequencing.
Removed materials were taken from site and former building connection areas received make-good and render repairs.
Project controls
Temporary scaffold access supported controlled work at the elevated footbridge and former building interfaces.
The demolition sequence was managed to suit the structure, access constraints and surrounding residential environment.
Former connection areas were made good and rendered after the bridge components were removed.
Project photographs
The photographs below document the existing structure, scaffold access, controlled removal, interface repairs and completed condition.
View the project sequence from the existing footbridge through scaffolded demolition and the completed condition.
Related services
Frequently asked questions
For related questions about scope, site information and delivery, read our civil construction planning questions.
SCE established scaffold access, dismantled and removed the decommissioned elevated footbridge, cleared the materials from site and completed make-good and render repairs at the former building connections.
It can be planned where the work zone can be separated and the retained building, access routes and services can be protected. At Lane Cove North, SCE used temporary scaffold access and controlled dismantling beside the residential property, then repaired the former bridge connections. For each new project, our team assesses the structure, occupancy, access and removal sequence before confirming the delivery plan.
Temporary scaffolding provided access for the controlled dismantling and removal activities.
SCE made good the former building connection areas and completed render repairs, followed by a final review of the work area.
Submit the property location, photographs, available drawings and reports through the website enquiry form. Identify the elements to remove, what must remain, occupied areas, access restrictions and required programme. SCE brings together engineering assessment and construction planning to define the demolition, waste removal and reinstatement package.
Send your plans, photographs and proposed removal scope through the enquiry form. SCE will review the engineering, site access, occupied areas and reinstatement requirements to plan the complete work package.