Lane Cove North Footbridge Demolition Project Video

Watch the 27-second project sequence from the existing decommissioned footbridge through scaffolded dismantling and the completed condition.

Lane Cove North controlled footbridge-demolition project sequence. Video duration: 27 seconds.

What This Video Shows

  • The decommissioned elevated footbridge before removal.
  • Temporary scaffold access and controlled dismantling.
  • Material removal and make-good render repairs at former connection areas.

Controlled demolition and make-good delivery

SCE completed the controlled demolition and make-good work shown here, including scaffold access, staged dismantling, material removal and render repairs at the former bridge connections. The full project record explains that delivered scope. For a new project, our engineering and construction team develops the proposed approach around the structure, its surroundings, access and required approvals, with design and certification responsibilities identified in the appointment.

View the full Lane Cove North project record

Plan a similar project with SCE

Explore our Lane Cove North construction services, bridge construction capability and qualifications and certifications. For a related reconstruction sequence, watch the Emu Heights bridge project video.

Send the property location, photographs, available drawings and access constraints through the enquiry form so SCE Corp can assess the required team and delivery scope.

Discuss your demolition or bridge project