Property and defect records
Provide the strata plan, affected locations, photographs, known incidents, prior reports, previous repairs, maintenance history, water-entry information and relevant correspondence.
Owners corporations and strata buildings
SCE Corp coordinates and delivers suitable concrete cancer repair scopes for strata buildings, with responsibility confirmation, defined repair requirements, occupied-site access planning, safety controls, approvals and project records.
Cracking, rust staining, delamination, spalling or exposed reinforcement on balconies, façades, slab edges, soffits, columns, car parks and other shared building elements may require prompt investigation. Visible deterioration does not by itself establish the cause, extent, structural significance, property responsibility or correct repair method.
Where loose concrete, falling material or instability is suspected, the owners corporation should arrange appropriate risk controls and professional advice before routine access or repair planning.
Provide the strata plan, affected locations, photographs, known incidents, prior reports, previous repairs, maintenance history, water-entry information and relevant correspondence.
Provide available engineering or consultant reports, investigation results, drawings, repair design or specification, testing requirements, hold points and completion criteria.
Confirm the decision-maker, approval status, access permissions, resident and tenant requirements, working hours, public protection, parking, services, containment and required programme.
Identify affected areas, apparent urgency, occupants, access constraints, earlier repairs and the records already available to the strata manager or committee.
Review the strata plan and relevant property information so the owners corporation can confirm responsibility, authority, insurance interfaces and the correct approval pathway.
Arrange the inspections, testing, opening-up, engineering or consultant input and temporary controls required to establish condition and repair requirements.
Set the repair areas, methodology, access, staging, exclusions, price basis, responsibilities, hold points, programme and acceptance requirements before work proceeds.
Manage resident notices, access, isolation, containment, noise, dust, debris, work at height, temporary works and inspections around the building's continued use.
Provide the agreed records and identify any outstanding consultant review, monitoring, maintenance, warranty or future-stage requirements.
Strata concrete repairs often affect residents, tenants, visitors, neighbours, parked vehicles, common accessways and building operations. The delivery plan may require exclusion zones, overhead protection, temporary access changes, containment, scaffold or rope access, noise and dust controls, work-hour restrictions and staged completion.
Under section 106 of the NSW Strata Schemes Management Act 2015, an owners corporation has a duty to maintain and repair common property. The actual property boundary, responsibility and decision pathway must still be confirmed for the affected element, including any applicable strata plan, by-laws, common-property memorandum, special resolution, contract or legal advice.
SCE's role is limited to the construction and coordination responsibilities included in its contract. Engineering assessment, regulated design, declarations, certification and statutory decisions remain with the responsible qualified, registered or authorised parties where required.
Quotations should use the same drawings, repair areas, assumptions, access method, testing, exclusions, provisional quantities and completion requirements so the committee can compare like with like.
The contract should state how concealed deterioration, additional repair quantities, reinforcement loss, access changes, consultant instructions and other discoveries will be measured, priced and approved.
Required records may include photographs, repair-area mapping, product details, material records, inspection and hold-point evidence, consultant documentation and future maintenance or monitoring requirements.
Review SCE's broader pathway for owners corporations, strata managers and common-property building works.
Use the dedicated remedial pathway for broad technical information about concrete cancer assessment and repair outside the narrower strata intent of this page.
Where recurring moisture or water entry may be contributing to deterioration, investigate and address the relevant source and interface requirements.
Verify SCE Corp's ISO 9001, ISO 14001 and ISO 45001 certifications, NSW DBP registration, contractor licence and insurance records.
Review relevant project records by asset, scope, contractual role, constraints and the evidence available for the completed work.
Use the planning tool to identify whether make-safe, investigation, consultant input or a defined contractor scope may be the appropriate next step.
Availability depends on the strata scheme, scope, access, approvals, safety, programme and commercial fit.
Responsibility depends on whether the affected element is common property, lot property or subject to another valid arrangement. An owners corporation has a statutory duty to maintain and repair common property under section 106 of the NSW Strata Schemes Management Act 2015, but the strata plan, by-laws, common-property memorandum and specific circumstances should be checked before work is authorised.
Provide the strata plan, photographs, affected locations, incident or maintenance records, earlier repair information, available engineering or consultant reports, drawings or specifications, access constraints, approval status, resident requirements and the requested programme. A defined and consistent scope supports more reliable quotation comparison.
That depends on the element, symptoms, risk and proposed work. Professional input may be required to determine the cause, extent, structural significance, testing, repair design, temporary controls, regulated design obligations and acceptance requirements. SCE does not replace the responsible engineer, consultant, certifier or registered practitioner.
Sometimes, subject to falling-material risk, access, exclusion zones, work at height, scaffold or rope access, dust, noise, debris, services, temporary works and emergency arrangements. The staging and resident communication plan must suit the building's use and the approved repair scope.
The strata manager and committee should confirm the owners corporation's authority, required meeting or resolution, expenditure approval, insurance interface, access permissions and any council, certifier, engineer, consultant or DBP-related requirements. The pathway depends on the scheme, contract and proposed work.
Key factors include the verified repair quantity, access method, height, containment, reinforcement condition, water entry, selected repair system, testing, temporary works, consultant requirements, resident constraints, working hours, staging, curing and latent conditions. Provisional quantities and variation rules should be stated clearly where the extent cannot be confirmed in advance.
The required handover should be agreed before work starts. Depending on the scope, it may include repair-area records, photographs, product and batch information, material records, inspection and hold-point evidence, consultant documentation, warranties, outstanding items and future monitoring or maintenance requirements.
Send the strata plan, reports, drawings, photographs, affected locations, access constraints, approval status and programme so SCE can assess scope definition, responsibilities and commercial fit.