Site and incident
Provide the address, affected area, when the incident occurred and what has changed since it was first observed.
Make-safe planning checklist
Make-safe work means temporary action to control immediate risks after building damage, such as securing damaged areas, providing weather protection or installing engineer-designed structural support. This checklist helps insurers, loss adjusters, strata managers and property managers prepare the incident, access and authority information needed to plan that response.
Immediate danger: do not enter an unsafe area. If there is an immediate threat to life or public safety, contact emergency services on 000 and the relevant authority or utility. Contact SCE to confirm the available response, safe access and required resources.
Useful first information
Good initial information helps identify the immediate condition, the authorised decision-makers and the inputs needed before any temporary construction activity is agreed.
Provide the address, affected area, when the incident occurred and what has changed since it was first observed.
Identify exclusion zones, affected services, occupants, access restrictions and controls already in place. Do not enter a damaged area to collect information.
Identify the insurer, loss adjuster, strata or property representative and the person authorised to discuss access, scope and expenditure.
Share available photographs, incident references, reports, drawings and claim details without exposing anyone to additional risk.
Make-safe work and permanent rectification answer different questions. Keeping them separate supports clearer scope, records and responsibility.
The immediate scope addresses identified risks to people, property and adjoining areas. It may involve temporary protection, structural stabilisation and site controls, with engineering input matched to the damage and proposed work.
Permanent repairs may require separate investigation, monitoring, design, approval, procurement and construction. These later steps are not implied by a temporary make-safe scope.
The checklist below gives the reviewing team practical information without asking occupants or representatives to inspect unsafe areas.
| Checklist item | What to include | Why it matters |
|---|---|---|
| Incident summary | Address, date, event type, affected area and any continuing change. | Establishes the known condition and urgency. |
| People and access | Occupancy, vulnerable users, site contacts, keys, inductions and access limits. | Supports safe planning and stakeholder coordination. |
| Known hazards | Damaged areas, utilities, loose materials, water, fire, impact or access concerns already identified. | Helps define exclusions and required inputs. |
| Authority to proceed | Authorised contact, insurer or claim reference and approval pathway. | Clarifies who can instruct and accept the agreed scope. |
| Available evidence | Safe photographs, reports, drawings, previous correspondence and relevant site records. | Reduces ambiguity before attendance or scope discussion. |
| Expected handover | Required notes, photographs, limitations, observations and next-step contacts. | Creates a controlled transition to assessment or repair planning. |
Sydney Contracting Engineers manages make-safe planning and construction, bringing together engineering input, temporary structural support, access controls, building protection and incident records. Our qualified team and appointed specialists develop the response around the damage, safe access and authority to proceed, then connect temporary measures with the next stage of investigation or reconstruction.
Confirm the incident, affected area, known hazards and authorised contacts.
Review site constraints and the information required from relevant parties.
Define the temporary works, engineering requirements, construction sequence and responsibilities.
Document completed actions, observations and limitations within the agreed scope.
Identify separately authorised investigation, design, approval or repair steps where required.
Explore emergency make-safe services for urgent building risks, insurance response services for claim-related work, and the Villawood project for an example of engineering, temporary support and reconstruction.

Use this pathway for an urgent building condition requiring review of temporary construction or site-control measures.

Use the insurance-specific pathway for authorised response coordination, site records and claim-supporting handover.

See SCE’s engineering design, temporary support, authority liaison and brickwork following major vehicle-impact damage. Reconstruction is ongoing.
Practical questions
For related questions about the approved scope, records and repair responsibilities, see our insurance repair planning questions.
Make-safe work uses limited, agreed construction or site-control measures to address a verified immediate condition, protect people or property, reduce further deterioration and support a controlled handover.
Provide the site address, incident summary, affected areas, known hazards, access arrangements, safe-to-obtain photographs, authorised contacts and any insurer or claim reference.
No. Do not enter an unsafe or restricted area to obtain information. Use only evidence that can be collected safely and follow directions from emergency services, authorities, utilities and appointed site representatives.
Our team reviews the incident, current hazards, access and the person authorised to instruct the work, then confirms the required engineering and trade resources, scope and attendance arrangements. Timing depends on safe access, the condition of the building and team availability. Keep people clear of unsafe areas while the response is arranged.
No. Make-safe work addresses the immediate verified condition. Permanent repairs may require separate investigation, design, approvals, procurement and construction under another authorised scope.
The insurer and its authorised representatives decide insurance coverage and claim approvals. SCE delivers the agreed engineering, design, temporary construction, testing and handover through its qualified team and appointed specialists. Design and certification responsibilities are assigned to the appropriately qualified practitioners, including independent appointments where required. Permanent reconstruction is separately scoped and authorised.
Submit the available incident, site, hazard, access and authority information through SCE’s website enquiry form. Our team reviews the immediate construction and engineering needs, confirms the response arrangements and explains the next steps toward a documented handover and permanent repairs.