1Scope and success criteria
Define the asset, boundaries, exclusions, interfaces, performance requirements, staging assumptions and handover outcomes. Separate essential requirements from options so the team can control change against an agreed baseline.
2Site and existing conditions
Verify surveys, access, levels, services, easements, structures, neighbours, geotechnical information, drainage, hazardous materials and environmental constraints relevant to the work. Record gaps and allocate each investigation before it becomes a site delay.
3Approvals and compliance
Prepare a live register of development consent or CDC requirements, construction certificates, certifier actions, authority approvals, permits, notifications, inspection points and closeout evidence. If development consent applies, NSW guidance requires the construction certificate before work starts.
4Coordinated design
Confirm the correct design status, revision and responsibility for architecture, structure, civil work, building services, waterproofing, fire, access and other relevant disciplines. Resolve clashes, incomplete details and construction tolerances before they reach procurement or site.
5Buildability and methodology
Test access, temporary works, lifting, excavation, sequencing, protection, weather exposure, logistics, interfaces and maintainability. SafeWork NSW emphasises eliminating or minimising construction risk during the design phase so far as reasonably practicable.
6Cost and procurement
Reconcile the estimate to the current design and scope. Identify allowances, exclusions, escalation exposure, long-lead items, substitutions, supplier evidence and approval dates. A low early price is not useful if essential scope is unpriced or late decisions drive variations.
7Program and interfaces
Build a logic-linked program around approvals, design release, procurement, possession, access, inspections, testing and handover—not only trade durations. Assign decision dates and define the consequences of late information.
8WHS, environment and quality
Plan site establishment, consultation, emergency arrangements, high-risk work, SWMS controls, environmental protection, inspection and test plans, records and non-conformance management. NSW construction projects valued at $250,000 or more require a principal contractor and written WHS management plan before work begins.
9Mobilisation decision
Hold a documented go/no-go review. Confirm that unresolved items have owners and acceptable controls, the issued documents are accessible, the workforce and supply chain are ready, and no statutory, safety or contract hold point prevents the planned start.