Planning and approval pathway
The documented design and CDC pathway established the approved basis for the proposed internal layout and construction works.
SCE project | private residential renovation and structural alteration
SCE Corp delivered and coordinated a Berowra Heights house renovation covering architectural-design and CDC-approval inputs, internal structural alteration, services rough-in, a new kitchen and bathroom, and the completed open-plan living area.
Project overview
The project record begins with the existing interior and planning concepts, then follows the works through temporary structural support, internal wall demolition, services rough-in and completion of the kitchen, bathroom and enlarged living area.
Architectural-design documentation and CDC approval formed part of the verified project record. SCE coordinated the construction sequence so the structural opening, service interfaces and internal finishes could be progressed as connected work stages.
SCE delivered and coordinated the construction works. Project-specific design, approval, inspection and certification responsibilities remained with the relevant appointed practitioners, certifier and authorities.
Delivery controls
The documented design and CDC pathway established the approved basis for the proposed internal layout and construction works.
Temporary support, ceiling opening and controlled wall removal were sequenced before closing and finishing the enlarged living area.
Plumbing rough-in and the kitchen, bathroom, ceiling, lighting and flooring works were coordinated across the internal renovation.
Genuine SCE project evidence
The images record the existing interior, planning material, principal construction stages and the completed kitchen, bathroom and open-plan living outcome. The planning graphic is identified as concept material and is not presented as completed-work evidence.
Project video
The video summarises the existing interior, planning and approval context, structural alteration, services rough-in and completed internal renovation.
Documented project outcome
The completion evidence records the new kitchen, renewed bathroom and enlarged living area with tiled flooring, renewed ceiling and downlights. The result is presented as project-specific construction evidence; no unsupported programme, energy-performance, value or durability guarantee is made.
Project questions
The documented works included planning and approval inputs, internal strip-out, temporary structural support, wall and ceiling demolition, plumbing-services rough-in, and completion of the kitchen, bathroom and open-plan living area.
Yes. The verified project record includes architectural-design documentation and CDC approval. SCE coordinated those project inputs and delivered the construction works within the approved project pathway.
The photographed sequence shows temporary support and an opened ceiling before controlled removal of the internal wall. The project-specific structural requirements remained governed by the approved documents and relevant appointed practitioner.
The project evidence shows red and blue plumbing-services rough-in within the stripped laundry area. Other service details are not claimed beyond the available record.
The completion photographs show the new kitchen, renewed bathroom and enlarged open-plan living area, including cabinetry, appliances, tiling, fixtures, flooring, ceiling and lighting finishes visible in the images.
No. It is project planning material combining a proposed ground-floor layout with finish concepts. The completed-work evidence is shown separately in the genuine project photographs.
SCE delivered and coordinated the construction works. Project-specific design, approval, inspection and certification responsibilities remained with the relevant appointed practitioners, certifier and authorities.
Provide the property address, existing photographs, proposed layout, available drawings and reports, approval status, required finishes, access constraints, programme and budget range so SCE can assess suitability.
Contact SCE with the property location, existing photographs, proposed changes, available drawings, approval status, access constraints, programme and required finishes for an initial suitability review.