Greenwich Ground-Floor Kitchen Wall Alteration Project Video

Watch the 27-second project sequence covering surface protection, temporary support, beam installation and the completed altered opening.

Greenwich ground-floor kitchen wall-alteration project sequence. Video duration: 27 seconds.

What This Video Shows

  • Protection of the existing kitchen and floor surfaces.
  • Temporary support and installation of the new steel beam.
  • Rendered make-good around the completed opening.

Planning a Similar Alteration

For a comparable alteration, provide SCE with the existing layout, structural drawings, access constraints and intended opening. These inputs allow the construction sequence, temporary support and required engineering responsibilities to be coordinated before work starts.

What belongs in a complete kitchen wall alteration scope?

The finished opening depends on more than supplying a beam. In this Greenwich project, SCE protected the existing kitchen and floor, retained temporary support during the opening and steelwork sequence, and completed the rendered make-good. These connected stages should be clear when comparing proposals, including what will be retained, removed, protected and reinstated.

Explore structural alteration services and engineering and design. The construction quote comparison tool helps identify scope differences before you select a proposal.

Compare the separate top-floor Greenwich alteration video and top-floor project case study, or browse our structural remedial projects.

See Greenwich construction services and SCE’s qualifications and certifications. Submit your project information through the SCE enquiry form, or explore our wider capability on the SCE Corp homepage.

View the full ground-floor Greenwich project record

Browse all SCE project and service videos