Greenwich Ground-Floor Kitchen Wall Alteration Project Video
Watch the 27-second verified project sequence covering surface protection, temporary support, beam installation and the completed altered opening.
What This Video Shows
- Protection of the existing kitchen and floor surfaces.
- Temporary support and installation of the new steel beam.
- Rendered make-good around the completed opening.
Project and Responsibility Context
The evidence does not identify the designer, certifier or registered-practitioner roles. This page records SCE’s construction work without attributing those responsibilities.