Greenwich Ground-Floor Kitchen Wall Alteration Project Video

Watch the 27-second verified project sequence covering surface protection, temporary support, beam installation and the completed altered opening.

Greenwich ground-floor kitchen wall-alteration project sequence. Video duration: 27 seconds.

What This Video Shows

  • Protection of the existing kitchen and floor surfaces.
  • Temporary support and installation of the new steel beam.
  • Rendered make-good around the completed opening.

Project and Responsibility Context

The evidence does not identify the designer, certifier or registered-practitioner roles. This page records SCE’s construction work without attributing those responsibilities.