Greenwich Top-Floor Kitchen Wall Alteration Project Video

Watch the 32-second verified project sequence covering work-area protection, temporary support, opening and beam works, rendering and plastering.

Greenwich top-floor kitchen wall-alteration project sequence. Video duration: 32 seconds.

What This Video Shows

  • Protected floor and kitchen surfaces before alteration work.
  • Temporary support, opening works and beam installation.
  • Rendering, plastering and make-good around the altered opening.

Project and Responsibility Context

The evidence does not establish project-specific DBP applicability or identify the designer, certifier or registered-practitioner roles. This page records SCE’s construction work without attributing those responsibilities.