Greenwich Top-Floor Kitchen Wall Alteration Project Video
Watch the 32-second verified project sequence covering work-area protection, temporary support, opening and beam works, rendering and plastering.
What This Video Shows
- Protected floor and kitchen surfaces before alteration work.
- Temporary support, opening works and beam installation.
- Rendering, plastering and make-good around the altered opening.
Coordinating the Alteration Works
SCE carried out the recorded opening and beam works, followed by rendering and plastering. For a comparable alteration, the structural design, temporary-support sequence and any applicable approvals are coordinated before the existing wall is opened.
Greenwich top-floor alteration video FAQs
What does the top-floor Greenwich kitchen video show?
The 32-second sequence records surface protection, temporary support, opening and beam works, then rendering, plastering and make-good around the altered opening.
What needs to be resolved before opening a wall for a similar alteration?
The structural design, temporary-support sequence and any applicable approvals need to be coordinated before the existing wall is opened. A completed-project video does not establish those requirements for another property.
Is this the same record as the ground-floor Greenwich kitchen project?
No. This page covers the top-floor kitchen alteration. Its linked project record describes that scope; the ground-floor alteration has its own watch page and project record.