Mobile cranes
Useful where the project needs equipment that can attend for defined lifts and leave the work area. Access, setup space, ground support and traffic interfaces remain critical.
Construction planning guide
Mobile, crawler, rough-terrain, truck-mounted, spider and Franna cranes can suit different access, ground and staging conditions. The right pathway depends on the project—not a generic equipment preference.
These categories provide a starting point for project discussions. Suitability must be confirmed against the actual load, site, equipment configuration, supplier information, temporary works, approvals and safe-work requirements.
Useful where the project needs equipment that can attend for defined lifts and leave the work area. Access, setup space, ground support and traffic interfaces remain critical.
May suit longer-duration or heavier site lifting where tracked movement and an adequately prepared operating area form part of the project plan.
Can be considered for uneven or less-developed site conditions, subject to equipment-specific access, ground-bearing and setup requirements.
Can support scheduled delivery-and-lift activities where road access, vehicle positioning, outriggers and surrounding operations can be controlled.
Compact configurations may help on constrained sites or within existing buildings, provided access dimensions, floor capacity and operating controls are verified.
Pick-and-carry equipment may help with planned movement around suitable sites. Travel paths, load control, ground conditions and interaction risks require specific assessment.
A useful comparison begins with the work and site information. Equipment should then be reviewed by the appropriately appointed supplier, lift planner, engineer or other competent party.
The lifting team needs to check the crane-specific load chart for the proposed configuration and working radius, including the relevant lifting gear. A crane that can reach a landing point may not have the required capacity at that reach. Safe Work Australia’s crane guidance explains why configuration and load charts matter.
Also separate the space needed to enter the site from the footprint needed to set up and work. Test both against the access route, support conditions, exclusion area and receiving location. Compare the whole programme: a lower daily hire rate can be outweighed by repeat mobilisation, interrupted deliveries or material handling between lifts. These checks inform specialist selection; they do not replace the engineered lifting plan.
The sequence below helps project teams organise early information before equipment-specific decisions are made.
Record what must be lifted or moved, the intended sequence, required locations and interfaces with the construction programme.
Collect current drawings, services information, photographs, access dimensions and available ground or structural information.
Provide verified information to the equipment supplier and appointed competent parties so configuration, setup and controls can be assessed.
Align approved equipment and lift requirements with site logistics, temporary works, deliveries, exclusion zones, neighbours and active operations.
Good early information helps identify whether the lifting requirement forms part of a suitable construction scope and which specialist inputs may be needed.
SCE can develop the engineering, procurement and construction package around the lifting requirement, integrating temporary works, access, deliveries and installation sequencing with the appointed lifting specialists.
Use the pathway that matches the project’s actual purpose. These links provide commercial, project-evidence and governance context without turning this article into a service page.
Depending on the project, possible categories include mobile, crawler, rough-terrain, truck-mounted, spider and Franna cranes. The appropriate option depends on the load, lift path, access, ground or structural conditions, programme and equipment-specific requirements.
Useful inputs include verified load weights and dimensions, pickup and landing points, reach, site drawings, access measurements, ground or slab information, nearby services, occupation constraints, programme requirements and appointed responsibilities.
These options may be considered for defined lifting activities where suitable access, setup space, ground support, vehicle positioning and site controls are available. Equipment suitability must be confirmed for the actual project by the appropriately appointed competent parties.
Common constraints include narrow access, limited setup space, overhead obstructions, underground services, slabs or basements, ground-bearing conditions, nearby buildings, public areas, active operations, delivery windows and interaction with other trades.
SCE provides engineering, design, procurement and construction, including specialist engineering and lifting interfaces where included in the agreed project scope. Crane hire, operation, equipment-specific lift planning and any independent certification are assigned to appropriately qualified and authorised parties. This article is not a crane-hire quotation or a site-specific lifting design.
Lifting activities can affect access, deliveries, temporary works, exclusion zones, neighbouring operations, trade sequencing and programme risk. Early coordination helps the project team identify required information, specialist inputs and interfaces before the work proceeds.
Provide the project address, intended scope, drawings, photographs, access information and known lifting requirements so SCE can review construction-service fit and identify the appropriate next step.