Subdivision Construction Services in Sydney NSW
SCE Corp delivers subdivision construction services for residential, industrial and commercial developments across Sydney and NSW. Subdivision construction involves converting raw land into serviced lots ready for building through coordinated civil works packages. This includes bulk earthworks, road construction, stormwater drainage, sewer installation, water reticulation, electrical conduits, communications infrastructure and landscaping. Developers, land owners and project managers engage our Civil Services team to deliver complete subdivision infrastructure from site clearing through to council handover. As an ISO certified civil contractor, we manage subdivision projects with documented quality systems that support certification and lot registration requirements.
Service coverage
How we deliver
Subdivision delivery requires coordination across multiple civil disciplines, utility authorities and council requirements. SCE Corp reviews development consent conditions, engineering drawings and staging plans to develop construction methodology and program. Earthworks establish road formations and lot levels before underground services are installed in coordinated trenching operations. Road construction follows with pavement layers, kerbs and footpaths. We coordinate authority connections for sewer, water, electrical and communications infrastructure. Stormwater systems including pits, pipes and detention basins are constructed and tested. Our project managers track progress against program, manage variations and coordinate inspections for practical completion certification.
Relevant posts and projects
Proof and trust
All subdivision projects are delivered under our ISO certified management systems. Our certifications include ISO 9001:2015 for quality management, ISO 14001:2015 for environmental management and ISO 45001:2018 for workplace health and safety. Subdivision projects require extensive documentation for council certification and lot registration which our quality systems support throughout delivery.
Speak with our team
Call +61 2 9051 9590 to discuss your subdivision project. For accurate quoting, provide development consent, civil engineering drawings, staging plans and any council conditions. We review every enquiry and confirm scope fit before proceeding.
Frequently Asked Questions
1. What is included in subdivision civil works?
Subdivision civil works include earthworks, road construction, stormwater drainage, sewer installation, water reticulation, electrical and communications conduits, footpaths and landscaping. SCE Corp delivers complete subdivision packages for residential, industrial and commercial developments.
2. How much does subdivision construction cost per lot in Sydney?
Subdivision costs vary based on lot sizes, site conditions, road requirements, service lengths and authority contributions. Costs typically range from tens of thousands to over one hundred thousand dollars per lot depending on complexity. Contact SCE Corp for project specific pricing.
3. How long does subdivision construction take?
Subdivision construction timeframes depend on number of lots, site conditions, staging and authority coordination. A typical 10 to 20 lot residential stage takes 3 to 6 months from site clearing to practical completion. Larger subdivisions are delivered in multiple stages.
4. What approvals are required before subdivision construction?
Subdivision requires development consent, construction certificate, authority approvals for service connections and environmental management plans. Work cannot commence until relevant approvals are in place and conditions addressed.
5. What is the difference between residential and industrial subdivision?
Industrial subdivisions require heavier duty road pavements, larger drainage systems, fire services and different lot configurations compared to residential. Service sizing and infrastructure standards differ based on intended use and traffic loading.
6. How are subdivision roads constructed?
Subdivision roads are constructed on prepared subgrade with layers of road base material, primer seal and asphalt or concrete surface. Kerbs, drainage and footpaths are integrated. Roads must meet council engineering standards for adoption. SCE Corp constructs roads compliant with council requirements.
7. What underground services are installed in subdivisions?
Underground services include stormwater drainage, sewer mains and connections, water mains and services, electrical conduits, street lighting cables, communications ducts and gas if required. Services are installed before road construction.
8. How is stormwater managed in new subdivisions?
Stormwater management includes pit and pipe networks, detention basins, water quality treatment devices and connection to council drainage systems. Design must comply with council requirements for water quantity and quality control.
9. What documentation is required for subdivision handover?
Subdivision handover requires works as executed drawings, material certificates, test results, CCTV of drainage, authority compliance certificates and maintenance bonds. Complete documentation supports council acceptance and lot registration.
10. What should developers provide when requesting a subdivision quote?
Provide development consent, civil engineering drawings, geotechnical report, staging plan, authority requirements and any council conditions. This allows accurate assessment of scope, methodology and program for pricing. Contact SCE Corp to discuss your subdivision.
Thank you for your visit and welcome to the construction home

