
Make-Safe Planning Checklist NSW
Make-safe planning checklist Make-Safe Planning Checklist for Insurers and Strata in NSW Make-safe work means temporary action to control immediate risks after building damage, such
Explore SCE’s services or review documented project examples:
Building ServicesCivil ServicesBuilding Remedial ServicesCladding ServicesInsurance ServicesStrata ServicesSCE Projects
Choose a topic to explore practical guides for your project. Each article links to relevant SCE services, advice or project evidence. You can also use the search and latest articles below.

Make-safe planning checklist Make-Safe Planning Checklist for Insurers and Strata in NSW Make-safe work means temporary action to control immediate risks after building damage, such

A practical NSW guide to identifying combustible cladding, assessing building-specific risk, responding to insurance queries and planning evidence-led next steps.

Golf course civil works Golf Course Pond Restoration: Civil Works and Water Management Golf course ponds can support irrigation, drainage, landscape character and play. When

Construction assurance · quality, environment and safety ISO Management Systems in Construction: What Clients Should Verify SCE’s ISO 9001, ISO 14001 and ISO 45001 certifications

NSW building recovery guide Bushfire Effects on Buildings and Recovery Planning in NSW Bushfire damage is rarely limited to what can be seen from the

Practical guidance for reviewing emergency evacuation procedures, fire safety plans, site roles, accessible egress, drills and post-incident building work in NSW.

Construction hoarding decision guide Class A vs Class B Hoarding: A Planning Checklist Choosing a construction hoarding approach starts with the public interface, overhead risk,

Australian construction outlook What Is the Future of Construction in Australia? Australia’s construction future depends on better coordination: clearer information, capable people, suitable prefabrication, resilient

NSW construction delivery guide What Does a Construction Contractor Do? Roles and Responsibilities in NSW A construction contractor turns a project brief into delivered work
Project video: A visual overview of SCE Corp’s building, remedial and civil project insights.
Watch the SCE construction insights video
Civil engineering connects the design and delivery of roads, drainage, utilities and other infrastructure. Good decisions consider ground conditions, neighbouring assets, maintenance and the people using the completed works. SCE combines engineering and construction experience to resolve these interfaces before and during site work.
Contractors organise the agreed construction scope, trades, procurement, site controls and programme. The contract should identify design responsibilities, inspections, approval gates and the evidence required at handover. SCE brings engineering, design, procurement, construction, testing, certification and handover together around the agreed project requirements.
NSW home building is subject to the applicable planning and building framework, the Home Building Act 1989 and relevant codes and standards. Confirm the approval pathway, contractor requirements and conditions for the particular property and work.
Heritage renovation repairs or adapts a heritage property while respecting its significant fabric. Identify the listing, affected elements and approval requirements before choosing materials or removing existing work.
Heritage controls can arise from NSW heritage legislation, local planning instruments and the property’s listing. Commonwealth protections may also apply to particular places. Check the actual site and proposed work with the relevant authority.
When choosing cladding materials, compare weather exposure, the complete wall system, fire requirements, appearance, maintenance, weight and installation details. A panel specification alone does not resolve windows, junctions, fixings, drainage or approval requirements.
Cladding forms part of a building’s enclosure and can affect fire performance and weather protection. Assess the proposed system, its evidence and installation details for the actual building, rather than relying on a marketing label.
NSW product-use restrictions and building regulations can affect existing-wall assessment and replacement work. Check the current rules, building class and proposed system with the appointed practitioners; do not assume one rule applies to every material or building.
Confirm whether demolition needs development consent, a complying development certificate or qualifies as exempt development. Check heritage and adjoining-property constraints, service disconnections, hazardous materials, contractor licensing, site controls and lawful waste disposal. The approval and risk assessment determine the project-specific requirements.
The principal NSW framework includes the Work Health and Safety Act 2011 and Work Health and Safety Regulation 2025. Construction teams must translate the applicable duties into site-specific controls, competent supervision, consultation and required documentation.
Suitable options may include responsibly sourced timber, recovered materials and lower-emission products where their performance is supported. Compare durability, maintenance, sourcing, transport, replacement and compatibility with the approved design rather than assuming one material is always greener.
Depending on the lift, alternatives can include mobile cranes, gantries, lifting frames or a different installation sequence. The lifting and temporary-works team must assess loads, reach, ground conditions, access and exclusion zones for the selected method.
The guides help owners and managers prepare questions about investigations, scope, access, occupation and handover, so they can compare proposals on the same basis. SCE also attends owners corporation meetings to explain the proposed work, material choices, staging and risks in plain language and answer residents’ questions.
The articles explain practical controls such as agreed samples, inspections before work is concealed, testing and traceable handover records. SCE documents selections and responsibilities early, checks the interfaces between trades and agrees who can release each hold point. This gives the client and delivery team a clear record of what has been accepted.
Record the reported concern, inspect the affected work, establish the cause and contractual responsibility, then agree the repair and acceptance evidence. Keep owners informed about access, programme and any ongoing maintenance or monitoring.
Project compliance starts with the actual building, proposed wall system and applicable requirements. The responsible practitioners review design, product evidence, installation details, inspections and required certifications together. AS 5113 evidence, where relevant, is one part of that assessment. SCE coordinates the engineering and construction work through testing, certification and handover; reading a general guide alone does not establish compliance.
Retaining sound heritage fabric can preserve character and avoid unnecessary replacement. The proposed use, condition, repair compatibility and approvals still need review; environmental benefits should be supported by the actual project evidence.
Plan work zones, safe routes, deliveries, service interruptions, emergency access and communication around the facility’s operations. Review the controls with the operator as work moves between stages and agree the conditions for reopening each area. SCE selects supervision to suit the work and gives site teams authority to stop when conditions need reassessment.
Product choice can affect durability, moisture behaviour, maintenance and operating performance. Coordinate it with the building design and installation details, and distinguish predicted benefits from measured results.
Start with the topic matching the proposed work, then gather the plans, condition evidence and constraints identified in the guide. Use the linked service, project and planning-tool pages to develop an enquiry with clear scope, assumptions and questions.
Explore our construction services and project examples at SCE Corp